2015 Final Corrective Measures Study Work Plan, Oct 2015

Now Available:
October 22, 2015 Former ASARCO East Helena Facility Final Corrective Measures Study Work Plan

Download this file as a 50MB PDF

2015–2016 Final Interim Measures Work Plan, May 2015

Now Available:
May 29, 2015 Former ASARCO East Helena Facility Draft Interim Measures Work Plan—2015 and 2016

Download this file as a 65MB PDF File

2015 Groundwater and Surface Water Corrective Action Monitoring Plan, March 2015

2015 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared March 2015. Download the PDF here.

2015–2016 Draft Interim Measures Work Plan, Feb 2015

Now Available:
February 4, 2015 Former ASARCO East Helena Facility Draft Interim Measures Work Plan

Download this file as an 80MB PDF File

2014 Supplemental Contaminant Source Area Investigation Report, Feb 2015

2014 Supplemental Contaminant Source Area Investigation Report for the Former East Helena Smelter Site. Prepared February 2015.

Download the PDF here.

2014 East Valley Controlled Groundwater Area Petition – Supporting Information, Aug 2014

Supporting Information for the East Valley Controlled Groundwater Area Petition – Lewis and Clark County, Montana

Prepared August 2014
Download the PDF here.

2014 Groundwater and Surface Water Corrective Action Monitoring Plan, July 2014

2014 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, Prepared July 2014. Download the PDF here.

2014 Final Interim Measures Work Plan, May 2014

2014 Former ASARCO East Helena Facility Interim Measures Work Plan, May 2014

Download Final_IMWP_2014_May2014

2014 Draft Interim Measures Work Plan, Dec 2013

Now Available:

December 9, 2013 Draft 2014 Interim Measures Work Plan Former ASARCO East Helena Facility (11MB PDF)

2013 Prickly Pear Creek Project Design Documents, July and Aug 2013

Two PDF documents: