2015 Final Corrective Measures Study Work Plan, Oct 2015
Now Available:
October 22, 2015 Former ASARCO East Helena Facility Final Corrective Measures Study Work Plan
Now Available:
October 22, 2015 Former ASARCO East Helena Facility Final Corrective Measures Study Work Plan
Now Available:
May 29, 2015 Former ASARCO East Helena Facility Draft Interim Measures Work Plan—2015 and 2016
2015 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared March 2015. Download the PDF here.
Now Available:
February 4, 2015 Former ASARCO East Helena Facility Draft Interim Measures Work Plan
2014 Supplemental Contaminant Source Area Investigation Report for the Former East Helena Smelter Site. Prepared February 2015.
Supporting Information for the East Valley Controlled Groundwater Area Petition – Lewis and Clark County, Montana
Prepared August 2014
Download the PDF here.
2014 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, Prepared July 2014. Download the PDF here.
2014 Former ASARCO East Helena Facility Interim Measures Work Plan, May 2014
Download Final_IMWP_2014_May2014
Now Available:
December 9, 2013 Draft 2014 Interim Measures Work Plan Former ASARCO East Helena Facility (11MB PDF)