Shot over the course of 2014 and 2015, this aerial flyover video showcases the progress of interim measures and construction at the East Helena Site. Activities included the Tito Park Area removal and excavation, Lower Lake dredging, Upper Lake marsh grading, and various phases of the Interim Cover Construction (ICS) process.